SORT BY
PAGE

148 Products Found

LNER/LMS/BR 21ton Double Bolster Wagon

A development of the standard LNER Plate wagon design. The two bolsters are removeable. The LNER, LMS and BR all built examples, a total of 2,400. Lasted into the 1970s. Kit includes pipe load. Transfers for LNER, LMS, BR 1950s- 70s. These finely moulded plastic wagon kits come complete with pin point axle wheels and bearings, 3 link couplings and transfers. This kit is supplied with pre-coloured moulded parts although painting can improve the appearance. Additional parts to enable the vehicle to be modelled incorporating modifications made to the prototypes during their working life are included where appropriate.

Loco Coal Wagon Transfers

Transfers (Pressfix) for LNER/ and BR Loco Coal wagon (from kit PS16)

Meat Van Transfers

Meat Van Transfers: Early LMS and BR periods (from kit PS18)

Mineral Wagon Transfers (Pressfix)

Transfers (Pressfix) for early and post TOPS BR 21 and 241/2T (from kits PS15 and PS25)

NBR/LNER Transfers.

Early NBR and Late Period LNER

O Gauge BR-LNER Steel Hopper Wagon Kit

The British Railways LNER 13-ton steel hopper wagon was based on an LNER design but produced in the early British Railways era between 1949 and 1953. It marked a step forward from earlier wooden-bodied wagons by using an all-steel, welded construction, which offered improved durability and reduced maintenance needs. The design reflected the LNER’s long-standing experience with mineral wagons, but was adapted for post-war production methods in BR workshops such as those at Shildon, Faverdale, and York.

Over 2,600 of these wagons were built, and they became a common sight in the North Eastern Region. This was partly because many goods yards in the area had coal-drop staithes, making the bottom-discharge hopper design especially efficient for unloading bulk materials. While they were primarily intended for transporting coal, the hoppers proved versatile and were later used to carry stone, sand, and other aggregates.

The 13-ton steel hopper was a reliable and workmanlike vehicle that served across the UK for several decades. Its robust construction meant it could withstand heavy use, and it became a mainstay of freight traffic in the post-war period. Although newer wagon designs eventually replaced them, some examples remained in service into the early 1980s, making them one of the longer-lived mineral wagon types of the mid-20th century.

Penrhyn Quarry Railway Bolster Wagons (3) Laser-cut kits (NG7)

Laser-cut wagon kits of 4-wheel narrow gauge bolster wagons found at many industrial locations.

Penrhyn Quarry Railway Slate Wagons (3) Laser-cut kits (NG7)

Laser-cut wagon kits of 4-wheel narrow gauge bolster wagons found at many industrial locations.

Penrhyn Quarry Workmen's Coach Laser-cut kit (NG7)

Laser cut wagon kit of a 4-wheel narrow Penrhyn Quarry Workmen's Coach, easily adapted for anyone's freelance railway.

Plate, Double Bolster and Trestle Wagon Transfers:

LNER/LMS/BR Wagon Transfers: Plate, Double Bolster and Trestle (from kits PS19/20 and 21).

Private Owners Steel Chassis 13ton Mineral Wagon

These ex-private owner wagons were built in the 1930s using steel chassis for collieries and merchants. They came under Government control in 1939, later allocated to the NCB, who then sold them to BR, where they lasted into the 1960s. Transfers for BR. These finely moulded plastic wagon kits come complete with pin point axle wheels and bearings, 3 link couplings and transfers. This kit is supplied with pre-coloured moulded parts although painting can improve the appearance. Additional parts to enable the vehicle to be modelled incorporating modifications made to the prototypes during their working life are included where appropriate.

RCH 1923 Pattern 7 Plank Mineral Wagon

Specified by the Railway Clearing House as the standard medium capacity coal wagon. Dates from 1923 and has oil lubricated axle boxes. In service until the early 1960s. These finely moulded plastic wagon kits come complete with pin point axle wheels and bearings, 3 link couplings and transfers. This kit is supplied with pre-coloured moulded parts although painting can improve the appearance. Additional parts to enable the vehicle to be modelled incorporating modifications made to the prototypes during their working life are included where appropriate.

PAGE

Trade Login

WOULD YOU LIKE TO BECOME A TRADE PARTNER?

PECO - PLEASE SUPPLY TEXT.
An introductory paragraph with criteria listed as bullets points, closing with contact call to action.