BROWSE PECO PRODUCTS
Browse through our complete product portfolio.
2403 Products Found
Inspection Pit
Modular design, makes it easy to assemble pits of any required length. A great addition to the LK-80 Modern Train Shed unit or create a modern diesel/EMU servicing shed using the Wills SSM300 Modern Industrial Building and SSM315 Extension kits.
Slide Rail Chairs
30 injection moulded chairs for the construction of turnouts, using Code 250 Flat Bottom rail.
Running Rail Chairs
60 injection moulded chairs for the construction of turnouts and plain track, using Code 250 Flat Bottom rail.
OO-9 2 ton Slate Wagon Festiniog Railway
Trains of slate wagons used to be gravity run from the quarries at Blaenau Ffestiniog to the harbour at Porthmadoc, this model pack of 3 ready to run wagons includes 1 braked vehicle and removable slate loads which are conveniently hollow, thus giving the modeller the added option of including some further weight if required.
Roughly one in five wagons was fitted with brakes. These were spread throughout the train and turned so the brake handles were all on the same side of the train, pointing towards Porthmadog. Different colours painted on the side bars denoted the various slate quarry companies; our packs feature random selections of these. As these wagons tend to run in long rakes, the models have semi-permanent close-couplings fitted in their NEM pockets. These can be pulled out with fine nosed pliers and replaced with conventional OO-9 hoop-and-loop couplings (supplied) at each end of the rake.
OO-9 2 ton Slate Wagon Festiniog Railway
Trains of slate wagons used to be gravity run from the quarries at Blaenau Ffestiniog to the harbour at Porthmadoc, this model pack is of 3 unbraked vehicles and has removable slate loads which are conveniently hollow, thus giving the modeller the added option of including some further weight if required.
Roughly one in five wagons was fitted with brakes. These were spread throughout the train and turned so the brake handles were all on the same side of the train, pointing towards Porthmadog. Different colours painted on the side bars denoted the various slate quarry companies; our packs feature random selections of these. As these wagons tend to run in long rakes, the models have semi-permanent close-couplings fitted in their NEM pockets. These can be pulled out with fine nosed pliers and replaced with conventional OO-9 hoop-and-loop couplings (supplied) at each end of the rake.
Lynton and Barnstaple 4 Wheel Open Wagon
These finely moulded plastic wagon kits come complete with pin point axle wheels. Glue and paint will be required, along with appropriate transfers.
Lynton and Barnstaple 4 Wheel Open Wagon
These finely moulded plastic wagon kits come complete with pin point axle wheels. Glue and paint will be required, along with appropriate transfers.
Telegraph Poles
Pack contains 6 Telegraph Poles, these also carried railway bell codes and phone connections between signal boxes and stations as well as GPO lines.
Station Nameboards
Pack contains 4 Station Nameboards and transfer lettering to make up the name of your choice.
Loading Gauge
After loading, open wagons were checked for height using this simple gauge to ensure that loads did not hit bridges etc. and therefore were usually placed near the yard exit.
LMS 48 feet Suburban Coach Kit
These non-corridor coaches were built between 1903 and 1910 by the Midland Railway. They were used as close coupled sets for suburban services in the Manchester and Birmingham areas, remaining in service until the early 1950's. Glue, paint and transfers are required to complete this model.
