BROWSE PECO PRODUCTS
Browse through our complete product portfolio.
1167 Products Found
Platform Edging - Stone
Fully detailed, injection moulded plastic sections of platform edging; these units can be curved if desired. Use with Ratio 308 Flag Stones or other surface material cut to the desired platform shape. (There are 5 lengths of edging per pack).
Platform Edging - Concrete
Fully detailed, injection moulded plastic sections of platform edging; these units can be curved if desired. Use with Ratio 308 Flag Stones or other surface material cut to the desired platform shape. (There are 5 lengths of edging per pack).
Platform Edging - Brick
Fully detailed, injection moulded plastic sections of platform edging; these units can be curved if desired. Use with Ratio 308 Flag Stones or other surface material cut to the desired platform shape. (There are 5 lengths of edging per pack).
Station Platform Shelter with Timber and Brick Huts
This plastic kit contains a platform shelter plus a timber and brick hut.
Station House, Brick Type
This kit will make 2 Station houses with single storey extensions; assembly can be varied , extra doors and windows are included.
Station Building, Brick Type
The pre coloured parts of this plastic kit can be assembled in a number of ways ; further kits can be combined to make a larger structure if required.
Field Gates, Stiles and Wicket Gate
A useful addition to the LK-85 Flexible Field Fencing.
Flexible Field Fencing
This fencing will follow ground contours with the posts remaining vertical. The LK-86 Stiles and Gates pack provides access places.
Signal Box
This pre coloured plastic kit is modelled on the iconic BR design built at Potters Bar in the 1950's. Full instructions included.
Goods Depot
A pre coloured plastic kit including a selection of accessories and full instructions.
Office Buildings
A pre coloured plastic kit that can be put together in a number of different configurations.
Train Shed/Locomotive Depot/Engine Shed
Kit consists of parts to build one complete Train Shed Unit which will span two tracks, and can be combined with further units to build a larger facility if required. Inspection pits were often placed in the tracks in these buildings (See LK-56/156). Easily adapted to create a modern building for non railway use.