SORT BY
PAGE

122 Products Found

3 Link Couplings

0 Gauge Chassis kits and Accessories for scratchbuilders and kit modification. This pack contains sufficient components to assemble four pairs of 3- link couplings. Three-link chain couplings, with no means of drawing the wagons together, were used to form the peculiarly British "loose coupled" freight train: since such trains were not fitted with an automatic through-train braking system there were no pipes to connect between the vehicles. Control of the train was assisted by the guard's van at the rear of the train, or in certain cases a series of vans spaced along the train, which kept the couplings taut and therefore also helped prevent snapped couplings. Such trains travelled at low speeds and were finally phased out in the 1970s.

GWR Tapered Shank Buffers

0 Gauge Chassis kits and Accessories for scratchbuilders and kit modification. This pack contains sufficient components to assemble four buffers and two 3- link couplings. Three-link chain couplings, with no means of drawing the wagons together, were used to form the peculiarly British "loose coupled" freight train: since such trains were not fitted with an automatic through-train braking system there were no pipes to connect between the vehicles. Control of the train was assisted by the guard's van at the rear of the train, or in certain cases a series of vans spaced along the train, which kept the couplings taut and therefore also helped prevent snapped couplings. Such trains travelled at low speeds and were finally phased out in the 1970s.

GWR Parallel Shank Buffers

0 Gauge Chassis kits and Accessories for scratchbuilders and kit modification. This pack contains sufficient components to assemble four buffers and two 3- link couplings. Three-link chain couplings, with no means of drawing the wagons together, were used to form the peculiarly British "loose coupled" freight train: since such trains were not fitted with an automatic through-train braking system there were no pipes to connect between the vehicles. Control of the train was assisted by the guard's van at the rear of the train, or in certain cases a series of vans spaced along the train, which were used to keep the couplings taut and therefore also helped prevent snapped couplings. Such trains travelled at low speeds and were finally phased out in the 1970s.

RCH Spoked Wheels

0 Gauge Chassis kits and Accessories for scratchbuilders and kit modification. This pack contains a pair of metal pin point axles plus bearings, and Railway Clearing House specification 3 foot 1¬? inch wagon 8 spoke wheels featuring free running metal rims on moulded centres.

Coach Duckets (Pack of 4)

0-16.5 Coach parts to enable the OR-31 and OR-32 Coach kits to be customized; also for scratchbuilding projects. (Pack of 4)

Coach Window Blanks (Pack of 8)

0-16.5 Coach parts to enable the OR-31 and OR-32 Coach kits to be customized; also for scratchbuilding projects. (Pack of 8)

Coach Windows (Pack of 7)

0-16.5 Coach parts to enable the OR-31 and OR-32 Coach kits to be customized; also for scratchbuilding projects. (Pack of 7)

Saloon Coach Window Panel (Pack of 6)

0-16.5 Coach parts to enable the OR-31 and OR-32 Coach kits to be customized; also for scratchbuilding projects. (Pack of 6)

Double Coach Window Panel (Pack of 6)

0-16.5 Coach parts to enable the OR-31 and OR-32 Coach kits to be customized; also for scratchbuilding projects. (Pack of 6)

Single Coach Window Panel (Pack of 6)

0-16.5 Coach parts to enable the OR-31 and OR-32 Coach kits to be customized; also for scratchbuilding projects.(Pack of 6)

Single Coach Door with Window (Pack of 6)

0-16.5 Coach parts to enable the OR-31 and OR-32 Coach kits to be customized; also for scratchbuilding projects. (Pack of 6)

4 Wheel Coach Chassis

0-16.5 Coach parts to enable the OR-31 and OR-32 Coach kits to be customised; also for scratch-building projects.

PAGE

Trade Login

WOULD YOU LIKE TO BECOME A TRADE PARTNER?

PECO - PLEASE SUPPLY TEXT.
An introductory paragraph with criteria listed as bullets points, closing with contact call to action.