SORT BY
PAGE

2493 Products Found

Sacks of Coal

Pack contains 24 Sacks of Coal, to use as a load or as detail for your coal yard or merchants. See Wills Ref. SS15 Coal Yard and Hut, Ratio Ref. 532 Coal Yard and Hut or 525 Coal/Timber Merchants.

Sewage Pipes

4 Sewage Pipes for use as a load or for a construction site. One of those common items that are rarely seen, yet make an essential contribution to healthy and pleasant living!

Sacks and Barrels

Pack contains 12 Sacks and 12 Barrels to add detail to your station goods yard or shed.

Electric Trolley and Trailer

Pack contains 1 Trolley and 2 Trailers to add detail to your station platform.

Trunks, Suitcases and Trolley 'Sack Truck'

Pack contains 4 Trunks, 6 Suitcases, and 2 Sack Trucks to add detail to your station platform.

Station Staff

Fully painted figures to add to your station or street scenes.

Standing Passengers Set B

Fully painted figures to add to your station.

Standing Passengers Set A

Fully painted figures to add to your station or street scenes.

Seated Passengers

Fully painted figures to add to your station seats, or rail or road vehicles.

Asbestos Sheets

Pack contains 6 Asbestos Sheets

Cycles and Stand

Pack contains 4 Cycles and 1 Stand

Track Signs

Pack contains 3 Track Signs

Level Signs and Mile Posts

Pack contains 6 assorted Level Signs and Mileposts

Tunnel Portal, Double Track

A sturdy, pre coloured Tunnel Mouth that is easy to integrate into your hillside

Tunnel Portal, Single Track

A sturdy, pre coloured Tunnel Mouth that is easy to integrate into your hillside

Hoardings, Modern Era

Pack contains 2 Hoardings plus a selection of signs

Hoardings, Steam Era

Pack contains 2 Hoardings plus a selection of signs

Fog Man, Hut and Brazier

Pack contains Fogman, Hut and Brazier. A Fogman, when fog or snow reduced visibility, placed detonators on the rails ahead of signals or temporary speed restrictions imposed due to works etc. to provide additional warning to train drivers.

Coalman and Scales

Pack includes 2 Coalmen and Weighing Scales. See Ratio 532 Coal depot and Wills SS15 Coal Yard and Hut.

Wattle Fencing

Pack includes 10 pieces

Post and Rail Fences

Pack includes 8 pieces

Kissing Gates

Pack contains 2 Kissing Gates

Hedges

Pack contains 8 pieces

Scammell Mechanical Horse and Trailer

A simple kit to make this commonplace British Railways vehicle. Kit contains pre-coloured parts and transfers. Requires glue and detail painting to complete.

Railway Container

An ideal load for the Scammell Mechanical Horse (Ref 5015) or a conflat wagon, or as a yard accesory or store.

Corn Stooks

Pack contains 6 Corn Stooks

Traffic Cones

Pack contains 20 assorted Traffic Cones

Bus Stop and Shelter

Pack contains 2 Bus Stops and Shelters plus stick on signs. See Modelscene Passengers Standing Sets A and B 5057 and 5058.

Telephone Boxes

Pack contains simple 4 piece kits to make 2 Telephone Boxes

Gas Lamp Posts

Pack contains simple kit to make 6 Gas Lamps (non- working)

Ballast Bins

Pack contains 3 Ballast Bins; seen spread along the railway to enable the permanent way crew (See Modelscene 5077 Track Maintenance Party) to add additional ballast where neccesary.

LMS 50ft Arc Roof Corridor Brake Coach Kit

A total of 650 coaches of this type were built at Wolverton between 1891 and 1903 by the London and North Western Railway for main line service and many of them were transferred into the LMS after the 1923 Grouping. Glue, paint and transfers are required to complete this model.

LMS 50ft Arc Roof Corridor Brake Composite Coach Kit

A total of 650 coaches of this type were built at Wolverton between 1891 and 1903 by the London and North Western Railway for main line service and many of them were transferred into the LMS after the 1923 Grouping. Glue, paint and transfers are required to complete this model.

LMS 50ft Arc Roof Corridor Composite Coach Kit

A total of 650 coaches of this type were built at Wolverton between 1891 and 1903 by the London and North Western Railway for main line service and many of them were transferred into the LMS after the 1923 Grouping. Glue, paint and transfers are required to complete this model.

LMS 50ft Arc Roof Corridor Coach Kit

A total of 650 coaches of this type were built at Wolverton between 1891 and 1903 by the London and North Western Railway for main line service and many of them were transferred into the LMS after the 1923 Grouping. Glue, paint and transfers are required to complete this model.

LMS Clerestory Brake Coach Kit

Built between 1898 and 1902 by the Midland Railway, these elegant non-corridor coaches were built for use on express routes. Glue, paint and transfers are required to complete this model.

LMS Clerestory Composite Coach Kit

Built between 1898 and 1902 by the Midland Railway, these elegant non-corridor coaches were built for use on express routes. Glue, paint and transfers are required to complete this model.

LMS Clerestory Coach Kit

Built between 1898 and 1902 by the Midland Railway, these elegant non-corridor coaches were built for use on express routes. Glue, paint and transfers are required to complete this model.

GWR 4 Wheel Composite Coach Kit

These coaches were constructed between 1890 and 1902 for rural duties, but lasted up until the 1950's on workmen's trains and the like. Glue, paint and transfers are required to complete this model.

GWR 4 Wheel Coach Kit

These coaches were constructed between 1890 and 1902 for rural duties, but lasted up until the 1950's on workmen's trains and the like. Glue, paint and transfers are required to complete this model.

SR/BR 28ton Bogie 'B' Van Kit

These vans were first built in 1937 and continued in use until 1986 on newspaper and mail trains. Transfers are included; glue and paints are required to complete this model.

SR 12ton Even Planked Ventilated Box Van Kit

1,000 of this design were built by the Southern Railway from 1936 to 1939. Extra vents and transfers are included for the Dover ferry van version. Glue and paints are required to complete this model.

SR/BR 12ton Box Van with Plywood Sides Kit

First built in 1945, 2,500 of these vans were constructed of plywood owing to the post war shortage of other materials. Transfers and brass buffers included; glue and paint are required to complete this model.

SR 12ton Uneven Planked Ventilated Box Van Kit

Built 1941 to 1944 by the Southern Railway, they also made 500 to the same design for the LMS and 650 for the GWR. Transfers are included; glue and paints are required to complete this model.

Permanent Way Wagons Kit

Set of 4 wagons, 2 flat wagons for carrying rail sections, and 2 low sided open wagons for ballast and track maintenance equipment. The kit includes metal wheels,transfers, brass buffer heads and the rail load as shown, and requires glue and paint to complete.

LMS Traffic Coal and 4 Plank Wagons Kit

Set of 2 wagons. Originally LNWR wagons, they were in common use for carrying coal and general merchandise. The kit includes metal wheels, transfers and brass buffers heads, and requires glue and paint to complete.

LMS 3 Plank Medium Open Wagon Kit

A standard design with drop sides to transport general merchandise, farm equipment etc. 6,600 were built between 1935 and 1947. Transfers are included; glue and paints are required to complete this model.

LMS 12ton Ventilated Box Van Kit

20,000 of this simple, workmanlike design were built between 1934 and 1944 for carrying perishable goods. Transfers are included; glue and paints are required to complete this model.

PAGE

Trade Login

WOULD YOU LIKE TO BECOME A TRADE PARTNER?

PECO - PLEASE SUPPLY TEXT.
An introductory paragraph with criteria listed as bullets points, closing with contact call to action.