BROWSE PECO PRODUCTS
Browse through our complete product portfolio.
717 Products Found
Vale of Rheidol 3rd Class Bogie Coach
These finely moulded plastic wagon kits come complete with pin point axle wheels. Glue and paint will be required, along with appropriate transfers.
Narrow Gauge Bogie Coach Chassis
These finely moulded plastic wagon kits come complete with pin point axle wheels. Glue and paint will be required, along with appropriate transfers.
Freelance 2 Compartment 4 Wheel Coach
These finely moulded plastic wagon kits come complete with pin point axle wheels. Glue and paint will be required, along with appropriate transfers.
Narrow Gauge Coach Seats
These finely moulded plastic wagon kits come complete with pin point axle wheels. Glue and paint will be required, along with appropriate transfers.
Freelance 4 Wheel Guards Van
These finely moulded plastic wagon kits come complete with pin point axle wheels. Glue and paint will be required, along with appropriate transfers.
Welshpool and Llanfair Rly
Locomotive body kit which will require a motor and chassis, glue, paint and transfers to complete.
Ffestiniog and Blaenau Scorcher/Nipper
Locomotive body kit which will require a motor and chassis, glue, paint and transfers to complete.
Branchlines Chassis for Fletcher Jennings Saddle Tank
The Branchlines (TM) chassis kits featured here are specially designed to fit the Peco 0-16.5 Locomotive Body kits and are complete with wheels and high quality can motors.
Branchlines Chassis for Beyer-Peacock Tram Locomotive
The Branchlines (TM) chassis kits featured here are specially designed to fit the Peco 0-16.5 Locomotive Body kits and are complete with wheels and high quality can motors.
Branchlines Chassis for Hunslet Quarry Engine
The Branchlines (TM) chassis kits featured here are specially designed to fit the Peco 0-16.5 Locomotive Body kits and are complete with wheels and high quality can motors.
LMS 50ft Arc Roof Corridor Brake Coach Kit
A total of 650 coaches of this type were built at Wolverton between 1891 and 1903 by the London and North Western Railway for main line service and many of them were transferred into the LMS after the 1923 Grouping. Glue, paint and transfers are required to complete this model.
LMS 50ft Arc Roof Corridor Brake Composite Coach Kit
A total of 650 coaches of this type were built at Wolverton between 1891 and 1903 by the London and North Western Railway for main line service and many of them were transferred into the LMS after the 1923 Grouping. Glue, paint and transfers are required to complete this model.
LMS 50ft Arc Roof Corridor Composite Coach Kit
A total of 650 coaches of this type were built at Wolverton between 1891 and 1903 by the London and North Western Railway for main line service and many of them were transferred into the LMS after the 1923 Grouping. Glue, paint and transfers are required to complete this model.
LMS 50ft Arc Roof Corridor Coach Kit
A total of 650 coaches of this type were built at Wolverton between 1891 and 1903 by the London and North Western Railway for main line service and many of them were transferred into the LMS after the 1923 Grouping. Glue, paint and transfers are required to complete this model.
LMS Clerestory Brake Coach Kit
Built between 1898 and 1902 by the Midland Railway, these elegant non-corridor coaches were built for use on express routes. Glue, paint and transfers are required to complete this model.
LMS Clerestory Composite Coach Kit
Built between 1898 and 1902 by the Midland Railway, these elegant non-corridor coaches were built for use on express routes. Glue, paint and transfers are required to complete this model.
LMS Clerestory Coach Kit
Built between 1898 and 1902 by the Midland Railway, these elegant non-corridor coaches were built for use on express routes. Glue, paint and transfers are required to complete this model.
GWR 4 Wheel Composite Coach Kit
These coaches were constructed between 1890 and 1902 for rural duties, but lasted up until the 1950's on workmen's trains and the like. Glue, paint and transfers are required to complete this model.
GWR 4 Wheel Coach Kit
These coaches were constructed between 1890 and 1902 for rural duties, but lasted up until the 1950's on workmen's trains and the like. Glue, paint and transfers are required to complete this model.
SR/BR 28ton Bogie 'B' Van Kit
These vans were first built in 1937 and continued in use until 1986 on newspaper and mail trains. Transfers are included; glue and paints are required to complete this model.
SR 12ton Even Planked Ventilated Box Van Kit
1,000 of this design were built by the Southern Railway from 1936 to 1939. Extra vents and transfers are included for the Dover ferry van version. Glue and paints are required to complete this model.
SR/BR 12ton Box Van with Plywood Sides Kit
First built in 1945, 2,500 of these vans were constructed of plywood owing to the post war shortage of other materials. Transfers and brass buffers included; glue and paint are required to complete this model.
SR 12ton Uneven Planked Ventilated Box Van Kit
Built 1941 to 1944 by the Southern Railway, they also made 500 to the same design for the LMS and 650 for the GWR. Transfers are included; glue and paints are required to complete this model.
Permanent Way Wagons Kit
Set of 4 wagons, 2 flat wagons for carrying rail sections, and 2 low sided open wagons for ballast and track maintenance equipment. The kit includes metal wheels,transfers, brass buffer heads and the rail load as shown, and requires glue and paint to complete.