SORT BY
PAGE

1051 Products Found

Wattle Fencing

Pack includes 10 pieces

Post and Rail Fences

Pack includes 8 pieces

Kissing Gates

Pack contains 2 Kissing Gates

Hedges

Pack contains 8 pieces

Scammell Mechanical Horse and Trailer

A simple kit to make this commonplace British Railways vehicle. Kit contains pre-coloured parts and transfers. Requires glue and detail painting to complete.

Railway Container

An ideal load for the Scammell Mechanical Horse (Ref 5015) or a conflat wagon, or as a yard accesory or store.

Corn Stooks

Pack contains 6 Corn Stooks

Traffic Cones

Pack contains 20 assorted Traffic Cones

Bus Stop and Shelter

Pack contains 2 Bus Stops and Shelters plus stick on signs. See Modelscene Passengers Standing Sets A and B 5057 and 5058.

Telephone Boxes

Pack contains simple 4 piece kits to make 2 Telephone Boxes

Gas Lamp Posts

Pack contains simple kit to make 6 Gas Lamps (non- working)

Ballast Bins

Pack contains 3 Ballast Bins; seen spread along the railway to enable the permanent way crew (See Modelscene 5077 Track Maintenance Party) to add additional ballast where neccesary.

LMS 50ft Arc Roof Corridor Brake Coach Kit

A total of 650 coaches of this type were built at Wolverton between 1891 and 1903 by the London and North Western Railway for main line service and many of them were transferred into the LMS after the 1923 Grouping. Glue, paint and transfers are required to complete this model.

LMS 50ft Arc Roof Corridor Brake Composite Coach Kit

A total of 650 coaches of this type were built at Wolverton between 1891 and 1903 by the London and North Western Railway for main line service and many of them were transferred into the LMS after the 1923 Grouping. Glue, paint and transfers are required to complete this model.

LMS 50ft Arc Roof Corridor Composite Coach Kit

A total of 650 coaches of this type were built at Wolverton between 1891 and 1903 by the London and North Western Railway for main line service and many of them were transferred into the LMS after the 1923 Grouping. Glue, paint and transfers are required to complete this model.

LMS 50ft Arc Roof Corridor Coach Kit

A total of 650 coaches of this type were built at Wolverton between 1891 and 1903 by the London and North Western Railway for main line service and many of them were transferred into the LMS after the 1923 Grouping. Glue, paint and transfers are required to complete this model.

LMS Clerestory Brake Coach Kit

Built between 1898 and 1902 by the Midland Railway, these elegant non-corridor coaches were built for use on express routes. Glue, paint and transfers are required to complete this model.

LMS Clerestory Composite Coach Kit

Built between 1898 and 1902 by the Midland Railway, these elegant non-corridor coaches were built for use on express routes. Glue, paint and transfers are required to complete this model.

LMS Clerestory Coach Kit

Built between 1898 and 1902 by the Midland Railway, these elegant non-corridor coaches were built for use on express routes. Glue, paint and transfers are required to complete this model.

GWR 4 Wheel Composite Coach Kit

These coaches were constructed between 1890 and 1902 for rural duties, but lasted up until the 1950's on workmen's trains and the like. Glue, paint and transfers are required to complete this model.

GWR 4 Wheel Coach Kit

These coaches were constructed between 1890 and 1902 for rural duties, but lasted up until the 1950's on workmen's trains and the like. Glue, paint and transfers are required to complete this model.

SR/BR 28ton Bogie 'B' Van Kit

These vans were first built in 1937 and continued in use until 1986 on newspaper and mail trains. Transfers are included; glue and paints are required to complete this model.

SR 12ton Even Planked Ventilated Box Van Kit

1,000 of this design were built by the Southern Railway from 1936 to 1939. Extra vents and transfers are included for the Dover ferry van version. Glue and paints are required to complete this model.

SR/BR 12ton Box Van with Plywood Sides Kit

First built in 1945, 2,500 of these vans were constructed of plywood owing to the post war shortage of other materials. Transfers and brass buffers included; glue and paint are required to complete this model.

PAGE

Trade Login

WOULD YOU LIKE TO BECOME A TRADE PARTNER?

PECO - PLEASE SUPPLY TEXT.
An introductory paragraph with criteria listed as bullets points, closing with contact call to action.