SORT BY
PAGE

1059 Products Found

Yard Crane

Kit of a useful general purpose type crane, also often seen at canal basins etc.

Inspection Pit

Modular design, makes it easy to assemble pits of any required length. A great addition to the LK-80 Modern Train Shed unit or create a modern diesel/EMU servicing shed using the Wills SSM300 Modern Industrial Building and SSM315 Extension kits.

Milk Churns

24 Churns, once a common site on station platforms.

Coal Sacks

A neat array of coal sacks, 10 ready filled, leaning against folded empties, complete with the coalman's special shovel designed to filter out the 'slack'!
Size (mm) 30 x 25 x 9. The Harburn Hamlet range of painted resin accessories provide interesting scenic details for your layout.

Coal Sacks

Stacked open coal sacks for use in a coal yard and as a flatbed lorry load for domestic delivery.
Size approx (mm) L52 x W25 x H18. The Harburn Hamlet range of painted resin accessories provide interesting scenic details for your layout.

Station Nameboards

Pack contains 4 Station Nameboards and transfer lettering to make up the name of your choice.

Telegraph Poles

Pack contains 6 Telegraph Poles, these also carried railway bell codes and phone connections between signal boxes and stations as well as GPO lines.

Loading Gauge

After loading, open wagons were checked for height using this simple gauge to ensure that loads did not hit bridges etc. and therefore were usually placed near the yard exit.

LMS 48 feet Suburban Coach Kit

These non-corridor coaches were built between 1903 and 1910 by the Midland Railway. They were used as close coupled sets for suburban services in the Manchester and Birmingham areas, remaining in service until the early 1950's. Glue, paint and transfers are required to complete this model.

LMS 48 feet Suburban Coach Kit

These non-corridor coaches were built between 1903 and 1910 by the Midland Railway. They were used as close coupled sets for suburban services in the Manchester and Birmingham areas, remaining in service until the early 1950's. Glue, paint and transfers are required to complete this model.

LMS 48 feet Suburban Coach Kit

These non-corridor coaches were built between 1903 and 1910 by the Midland Railway. They were used as close coupled sets for suburban services in the Manchester and Birmingham areas, remaining in service until the early 1950's. Glue, paint and transfers are required to complete this model.

LMS 48 feet Suburban Coach Kit

These non-corridor coaches were built between 1903 and 1910 by the Midland Railway. They were used as close coupled sets for suburban services in the Manchester and Birmingham areas, remaining in service until the early 1950's. Glue, paint and transfers are required to complete this model.

PAGE

Trade Login

WOULD YOU LIKE TO BECOME A TRADE PARTNER?

PECO - PLEASE SUPPLY TEXT.
An introductory paragraph with criteria listed as bullets points, closing with contact call to action.