BROWSE PECO PRODUCTS
Browse through our complete product portfolio.
210 Products Found
LNER 20ton Hopper Wagon
13,645 of these hoppers were built, this kit representing one from the first batch of 409 built in 1936. Featuring riveted construction and LNER brake gear, many lasted into the 1970s. Transfers for LNER and BR. These finely moulded plastic wagon kits come complete with pin point axle wheels and bearings, 3 link couplings and transfers. This kit is supplied with pre-coloured moulded parts although painting can improve the appearance. Additional parts to enable the vehicle to be modelled incorporating modifications made to the prototypes during their working life are included where appropriate.
BR 21ton Coal Hopper Wagon
16,800 of these wagons were constructed in the 1950s. They were widely used throughout the North East for the transport of coal. Roller bearing axle boxes were applied to some in the 1960s, options for which are in the kit, and lasted until the 1980s. Transfers for early, late and post-TOPS BR. These finely moulded plastic wagon kits come complete with pin point axle wheels and bearings, 3 link couplings and transfers. This kit is supplied with pre-coloured moulded parts although painting can improve the appearance. Additional parts to enable the vehicle to be modelled incorporating modifications made to the prototypes during their working life are included where appropriate.
Loading Gauge
An essential piece of equipment that was placed near the exit from every goods yard, along with a catch turnout, signal etc.
Yard Crane
Kit of a useful general purpose type crane, also often seen at canal basins etc.
Concrete Sleepers
60 concrete effect sleepers for track construction using Code 143 Flat Bottom rail.
Turnout Blades/Brackets
1 set of Turnout Blades and Brackets for the construction of turnouts, using Code 143 Flat Bottom rail.
Standard Straight
Peco Setrack Bullhead 0 Gauge track makes it possible have somewhere to run trains without having to build or find room for a fixed layout. With Setrack you can lay out your trackwork indoors on the floor or out on the patio in any configuration you choose and pack it away again afterwards. Compatible with and made to the same high standard of detail and realism as the Bullhead Streamline range, it can also be incorporated into a Streamline layout without problems. Made with solid nickel silver rail to the classic bullhead section and check rail are also machined from solid rail. The SL-713 0 Gauge Bullhead to Flat Bottom Transition Track makes it easy to also incorporate the Setrack range into a layout using Flat Bottom track.
Rail Joiner
Peco Streamline Flat Bottom 0 Gauge track is superbly detailed, with correct scale width 'wood grain' sleepers and integrally moulded baseplates with Pandrol (TM) type rail fixings.
The SL-713 Transition Track is an ideal way to connect Flat Bottom track to the Bullhead Setrack and Streamline track systems.
GWR 12ton Motor Car Van
Similar to diagram G31, these wagons were built in 1946 and 1947, but with a plywood body. They lasted into the 1960s. Transfers for GWR and BR. These finely moulded plastic wagon kits come complete with pin point axle wheels and bearings, 3 link couplings and transfers. This kit is supplied with pre-coloured moulded parts although painting can improve the appearance. Additional parts to enable the vehicle to be modelled incorporating modifications made to the prototypes during their working life are included where appropriate.
GWR 12ton Motor Car Van
350 of these were built between 1933 and 1936. Their telegraphic code was MOGO. The main traffic was from Morris Cowley, but might also have been used for general merchandise. All were withdrawn in the 1960s. Transfers for GWR and BR. These finely moulded plastic wagon kits come complete with pin point axle wheels and bearings, 3 link couplings and transfers. This kit is supplied with pre-coloured moulded parts although painting can improve the appearance. Additional parts to enable the vehicle to be modelled incorporating modifications made to the prototypes during their working life are included where appropriate.