SORT BY
PAGE

219 Products Found

Side Tip Wagon

White Metal Kit of typical vehicle based on the Welsh narrow gauge stock from the heyday of the slate traffic era. (Couplings, paint and transfers not included).

Signal Box Interior

A kit containing common objects found in any signal box, such as the comfy leather armchair, stove, token machines, desk, a shelf with various rule books lined up, a phone, a clock, and the most important items, the kettle and mug of tea.

Signal Ladders (Pack of 4)

Single Coach Door with Window (Pack of 6)

0-16.5 Coach parts to enable the OR-31 and OR-32 Coach kits to be customized; also for scratchbuilding projects. (Pack of 6)

Single Coach Window Panel (Pack of 6)

0-16.5 Coach parts to enable the OR-31 and OR-32 Coach kits to be customized; also for scratchbuilding projects.(Pack of 6)

Slate Wagon 1ton

White Metal Kit of typical vehicle based on the Welsh narrow gauge stock from the heyday of the slate traffic era. (Couplings, paint and transfers not included).

Slide Rail Chairs

50 injection moulded chairs for the construction of turnouts, using Code 124 Bullhead rail.

Slide Rail Fastenings (Pack of 48)

50 injection moulded chairs for the construction of turnouts, using Code 143 Flat Bottom rail.

Sprung LMS Brake Van Buffers

Kit and Scratch builder's accessory. Pack contains sufficient parts for 4 Buffers

Sprung SR Brake Van Buffers

Kit and Scratch builder's accessory. Pack contains sufficient parts for 4 Buffers

Sprung Wagon Buffers

Kit and Scratch builder's accessory. Pack contains sufficient parts for 4 Buffers

Sprung Wagon Buffers NB Style

Kit and Scratch builder's accessory. Pack contains sufficient parts for 4 Buffers

Sprung Wagon Buffers RCH style

Kit and Scratch builder's accessory. Pack contains sufficient parts for 4 Buffers

SR 12ton 8 Plank Open Wagon

Only the Southern had 8-plank open wagons, the type favoured by the SECR and LSWR. With many variations, this kit represents one of 3,000 built in 1926 – 1928. Lasted until the early ‘60s. Transfers for SR and BR. These finely moulded plastic wagon kits come complete with pin point axle wheels and bearings, 3 link couplings and transfers. This kit is supplied with pre-coloured moulded parts although painting can improve the appearance. Additional parts to enable the vehicle to be modelled incorporating modifications made to the prototypes during their working life are included where appropriate.

SR 12ton Goods Van

Features the characteristic elliptical roof. This kit represents one of the 450 built 1929 – 1931. These vans lasted into the 1960s, and some found further use in departmental service. Transfers for SR and BR. These finely moulded plastic wagon kits come complete with pin point axle wheels and bearings, 3 link couplings and transfers. This kit is supplied with pre-coloured moulded parts although painting can improve the appearance. Additional parts to enable the vehicle to be modelled incorporating modifications made to the prototypes during their working life are included where appropriate.

SR 25ton Goods Brake Van

Construction of this type began in 1929, lasting until 1933. They tended to be used on local and slow goods trains. After Nationalisation they migrated into the BR system, some lingering on into the 1970s and 1980s. Transfers for SR and BR. These finely moulded plastic wagon kits come complete with pin point axle wheels and bearings, 3 link couplings and transfers. This kit is supplied with pre-coloured moulded parts although painting can improve the appearance. Additional parts to enable the vehicle to be modelled incorporating modifications made to the prototypes during their working life are included where appropriate.

SR Banana Van

200 of these vans were built in 1935 and lasted into the 1960s. They were not confined to the Southern, and could therefore be found throughout Britain, especially as bananas were imported through a number of ports. Transfers for SR and BR. These finely moulded plastic wagon kits come complete with pin point axle wheels and bearings, 3 link couplings and transfers. This kit is supplied with pre-coloured moulded parts although painting can improve the appearance. Additional parts to enable the vehicle to be modelled incorporating modifications made to the prototypes during their working life are included where appropriate.

SR Insulated Van

75 insulated vans were built in 1931, and were used for meat and banana traffic. The carrying capacity was increased to 11 tons in the early 1940s, and lasted in service into the 1960s. Transfers for SR and BR. These finely moulded plastic wagon kits come complete with pin point axle wheels and bearings, 3 link couplings and transfers. This kit is supplied with pre-coloured moulded parts although painting can improve the appearance. Additional parts to enable the vehicle to be modelled incorporating modifications made to the prototypes during their working life are included where appropriate.

SR Meat Van

The Southern built 100 of these vans between 1931 and 1934 to carry fresh meat from the West Country to principle markets in London and the Midlands. They lasted in service into the 1960s. The sliding doors made them quite unusual. Transfers for SR and BR. These finely moulded plastic wagon kits come complete with pin point axle wheels and bearings, 3 link couplings and transfers. This kit is supplied with pre-coloured moulded parts although painting can improve the appearance. Additional parts to enable the vehicle to be modelled incorporating modifications made to the prototypes during their working life are included where appropriate.

SR Standard Cattle Wagon

The Southern built 299 of these vans between 1930 and 1939. Many of these wagons lasted into the 1960s, despite the decline in livestock traffic. Transfers for SR and BR. These finely moulded plastic wagon kits come complete with pin point axle wheels and bearings, 3 link couplings and transfers. This kit is supplied with pre-coloured moulded parts although painting can improve the appearance. Additional parts to enable the vehicle to be modelled incorporating modifications made to the prototypes during their working life are included where appropriate.

SR Wagon Tarpaulin

O Scale SR wagon tarpaulin, produced from a material that convincingly replicates the texture and look of canvas tarpaulins once commonly used on open wagons, to protect the contents underneath. Each product contains 3 tarpaulins.

SR/BR Station Seats

Kit for 4 seats, a post war steel and timber design which originated on the Southern Railway.

Standard Curve, 2nd Radius

PECO Setrack Bullhead 0 Gauge track makes it possible have somewhere to run trains without having to build or find room for a fixed layout. With Setrack you can lay out your trackwork indoors on the floor or out on the patio in any configuration you choose and pack it away again afterwards. Compatible with and made to the same high standard of detail and realism as the Bullhead Streamline range, it can also be incorporated into a Streamline layout without problems. Made with solid nickel silver rail to the classic bullhead section and check rail are also machined from solid rail. The SL-713 0 Gauge Bullhead to Flat Bottom Transition Track makes it easy to also incorporate the Setrack range into a layout using Flat Bottom track.

Standard Straight

Peco Setrack Bullhead 0 Gauge track makes it possible have somewhere to run trains without having to build or find room for a fixed layout. With Setrack you can lay out your trackwork indoors on the floor or out on the patio in any configuration you choose and pack it away again afterwards. Compatible with and made to the same high standard of detail and realism as the Bullhead Streamline range, it can also be incorporated into a Streamline layout without problems. Made with solid nickel silver rail to the classic bullhead section and check rail are also machined from solid rail. The SL-713 0 Gauge Bullhead to Flat Bottom Transition Track makes it easy to also incorporate the Setrack range into a layout using Flat Bottom track.

PAGE

Trade Login

WOULD YOU LIKE TO BECOME A TRADE PARTNER?

PECO - PLEASE SUPPLY TEXT.
An introductory paragraph with criteria listed as bullets points, closing with contact call to action.