SORT BY
PAGE

63 Products Found

Goods Yard Weighbridge

One of the fundamental aspects of safety on the railway was that wagons should never be overloaded. To do so would risk trains not having sufficient braking capacity to slow and stop safely. To manage loading at many industrial locations, each wagon would pass over a Weighbridge - to check their weight. Each wagon would display its tare weight, which could be deducted from the total weight, to ascertain the net weight of the load - simple mathematics! The new Ratio kit is a great representation of a typical Weighbridge, not dissimilar to the one, once located at Shildon Wagon Works in the North East. Combining a mixture of materials, the plastic parts make up the hut and laser-cut wood parts form the actual weighing scales, which fit in and around a length of ST-201 PECO Setrack track, included in the kit. 

Another useful addition to the extensive range of Ratio OO/HO scale railway structure kits.

Coaling Tower

These towers are an impressive sight and were an essential feature on mainline railways. The Pecoscene ranges provide the perfect loading material, Real Coal (PS-330 -332), Limestone (PS-342 and 3), Sand (PS-344), Iron Ore (PS-340), Grey Stone (PS-300- 307), and Brown Stone (PS-310 - 317) for a quarry, mine or pit loading hopper. Supplied with pre-coloured parts although painting and/or weathering can add realism (See the Pecoscene Weathering Powder range PS-360 - 365); glue is required to complete this model. Footprint: 116mm x 92mm, Height 181mm

OO-9 BUG BOX - KING CHARLES III CORONATION 2023 - LTD EDT

Celebrating the coronation of His Majesty the King on 6th May. We have produced a limited edition model in a coronation livery for both models, incorporating the official logo for this historical event.

The curiously-named "Bug Box" 4-wheel coaches were the first passenger carrying coaches built for the Ffestiniog Railway. Dating from 1864 to 1867 they were built by Brown, Marshall & company. The term "Bug Box is a more recent term given to them, possibly in the 1950s, and originally they were referred to as "Small Birmingham's".

OO-9 FR Quarryman Coach, Green, Brake Coach (Double Balcony)

From 1867 the Ffestiniog Railway used dedicated carriages to carry workmen to and from the slate quarries around Blaenau Ffestiniog. From 1885 to 1887, eighteen of what are now referred to as the ‘Type 3’ Quarrymen’s carriage were built featuring sprung axle boxes, one central door on each side and droplight windows. More of the same design were made to replace the older carriages and there were a total of thirty-six in the 1900s. Archive images show a significant number of these coaches being used to transport workers to the quarry site.

 

OO-9 FR Quarryman Coach, Green, Brake Coach (Single Balcony)

From 1867 the Ffestiniog Railway used dedicated carriages to carry workmen to and from the slate quarries around Blaenau Ffestiniog. From 1885 to 1887, eighteen of what are now referred to as the ‘Type 3’ Quarrymen’s carriage were built featuring sprung axle boxes, one central door on each side and droplight windows. More of the same design were made to replace the older carriages and there were a total of thirty-six in the 1900s. Archive images show a significant number of these coaches being used to transport workers to the quarry site.

 

OO-9 FR Quarryman Coach

From 1867 the Ffestiniog Railway used dedicated carriages to carry workmen to and from the slate quarries around Blaenau Ffestiniog. From 1885 to 1887, eighteen of what are now referred to as the ‘Type 3’ Quarrymen’s carriage were built featuring sprung axle boxes, one central door on each side and droplight windows. More of the same design were made to replace the older carriages and there were a total of thirty-six in the 1900s. Archive images show a significant number of these coaches being used to transport workers to the quarry site.

 

Bullhead OO Gauge Crossing

Bullhead track has been in use on the railways since the earliest times, and is still very much in evidence today. These superb turnouts give an authentic 00 scale look to your layout, and feature metal check rails and prototypical machined turnout blades.

Another feature of these turnouts is that both routes remain electrically live, making them ideal for DCC operation. They are constructed to our new versatile Unifrog design which can be operated, powered and switched like an Electrofrog or left unpowered if preferred.

Peco Streamline Code 75 track meets the standards of enthusiasts who prefer to run trains on scale height rail. Today most manufacturers' wheels are suitable for use on Code 75 track but some vintage models may have flanges which are too deep to clear the rail fixings. Code 75 can be easily combined with code 100 track by using the SL-113 Transition Track.

Bullhead OO Gauge Slip - Double

Bullhead track has been in use on the railways since the earliest times, and is still very much in evidence today. These superb turnouts give an authentic 00 scale look to your layout, and feature metal check rails and prototypical machined turnout blades.

Another feature of these turnouts is that both routes remain electrically live, making them ideal for DCC operation. They are constructed to our new versatile Unifrog design which can be operated, powered and switched like an Electrofrog or left unpowered if preferred.

Peco Streamline Code 75 track meets the standards of enthusiasts who prefer to run trains on scale height rail. Today most manufacturers' wheels are suitable for use on Code 75 track but some vintage models may have flanges which are too deep to clear the rail fixings. Code 75 can be easily combined with code 100 track by using the SL-113 Transition Track.

Bullhead OO Gauge Slip - Single

Bullhead track has been in use on the railways since the earliest times, and is still very much in evidence today. These superb turnouts give an authentic 00 scale look to your layout, and feature metal check rails and prototypical machined turnout blades.

Another feature of these turnouts is that both routes remain electrically live, making them ideal for DCC operation. They are constructed to our new versatile Unifrog design which can be operated, powered and switched like an Electrofrog or left unpowered if preferred.

Peco Streamline Code 75 track meets the standards of enthusiasts who prefer to run trains on scale height rail. Today most manufacturers' wheels are suitable for use on Code 75 track but some vintage models may have flanges which are too deep to clear the rail fixings. Code 75 can be easily combined with code 100 track by using the SL-113 Transition Track.

OO-9 FR Bug Box Coach, Zoo Car, Early Preservation Livery

The curiously-named "bug Box" 4-wheel coaches were the first passenger carrying coaches built for the Ffestiniog Railway. Dating from 1864 to 1867 they were built by Brown, Marshall & company. The term "Bug Box is a more recent term given to them, possibly in the 1950s, and originally they were referred to as "Small Birmingham's".

There are three types of vehicle: First Class, Third Class, and Open third, sometimes referred to as “Zoo” cars.

OO-9 FR Bug Box Coach, 3rd Class, Early Preservation Livery

The curiously-named "bug Box" 4-wheel coaches were the first passenger carrying coaches built for the Ffestiniog Railway. Dating from 1864 to 1867 they were built by Brown, Marshall & company. The term "Bug Box is a more recent term given to them, possibly in the 1950s, and originally they were referred to as "Small Birmingham's".

There are three types of vehicle: First Class, Third Class, and Open third, sometimes referred to as “Zoo” cars.

OO-9 FR Bug Box Coach, 1st Class, Early Preservation Livery

The curiously-named "bug Box" 4-wheel coaches were the first passenger carrying coaches built for the Ffestiniog Railway. Dating from 1864 to 1867 they were built by Brown, Marshall & company. The term "Bug Box is a more recent term given to them, possibly in the 1950s, and originally they were referred to as "Small Birmingham's".

There are three types of vehicle: First Class, Third Class, and Open third, sometimes referred to as “Zoo” cars.

PAGE

Trade Login

WOULD YOU LIKE TO BECOME A TRADE PARTNER?

PECO - PLEASE SUPPLY TEXT.
An introductory paragraph with criteria listed as bullets points, closing with contact call to action.