BROWSE PECO PRODUCTS
Browse through our complete product portfolio.
1051 Products Found
Track Maintenance Party
Fully painted figures to depict a permanent way team. See Modelscene 5002 Ballast Bins; Lineside Hut Kits Ratio Ref. 511 and 518, also Wills Ref. SS50.
Cable Laying Party
Pack contains 3 painted figures, Cable Drum and Wheelbarrow. Use Modelscene 5079 Cable Drums to extend this set.
Cable Drums
Pack contains 2 Cable Drums as supplied in the Modelscene 5078 Cable Laying Party.
Sacks of Coal
Pack contains 24 Sacks of Coal, to use as a load or as detail for your coal yard or merchants. See Wills Ref. SS15 Coal Yard and Hut, Ratio Ref. 532 Coal Yard and Hut or 525 Coal/Timber Merchants.
Packing Cases
Pack contains 3 Packing cases to use as a load or as detail for your goods yard.
Oil Drums
Pack contains 12 Oil Drums to use as a load or as detail for your goods yard or oil depot. See Ratio Ref. 529 Oil Depot
Sewage Pipes
4 Sewage Pipes for use as a load or for a construction site. One of those common items that are rarely seen, yet make an essential contribution to healthy and pleasant living!
Sacks and Barrels
Pack contains 12 Sacks and 12 Barrels to add detail to your station goods yard or shed.
Electric Trolley and Trailer
Pack contains 1 Trolley and 2 Trailers to add detail to your station platform.
Trunks, Suitcases and Trolley 'Sack Truck'
Pack contains 4 Trunks, 6 Suitcases, and 2 Sack Trucks to add detail to your station platform.
Seated Passengers
Fully painted figures to add to your station seats, or rail or road vehicles.
Tunnel Portal, Double Track
A sturdy, pre coloured Tunnel Mouth that is easy to integrate into your hillside
Tunnel Portal, Single Track
A sturdy, pre coloured Tunnel Mouth that is easy to integrate into your hillside
Fog Man, Hut and Brazier
Pack contains Fogman, Hut and Brazier. A Fogman, when fog or snow reduced visibility, placed detonators on the rails ahead of signals or temporary speed restrictions imposed due to works etc. to provide additional warning to train drivers.
Coalman and Scales
Pack includes 2 Coalmen and Weighing Scales. See Ratio 532 Coal depot and Wills SS15 Coal Yard and Hut.
Scammell Mechanical Horse and Trailer
A simple kit to make this commonplace British Railways vehicle. Kit contains pre-coloured parts and transfers. Requires glue and detail painting to complete.
Railway Container
An ideal load for the Scammell Mechanical Horse (Ref 5015) or a conflat wagon, or as a yard accesory or store.
Bus Stop and Shelter
Pack contains 2 Bus Stops and Shelters plus stick on signs. See Modelscene Passengers Standing Sets A and B 5057 and 5058.
LMS 50ft Arc Roof Corridor Brake Coach Kit
A total of 650 coaches of this type were built at Wolverton between 1891 and 1903 by the London and North Western Railway for main line service and many of them were transferred into the LMS after the 1923 Grouping. Glue, paint and transfers are required to complete this model.
Ballast Bins
Pack contains 3 Ballast Bins; seen spread along the railway to enable the permanent way crew (See Modelscene 5077 Track Maintenance Party) to add additional ballast where neccesary.
LMS 50ft Arc Roof Corridor Composite Coach Kit
A total of 650 coaches of this type were built at Wolverton between 1891 and 1903 by the London and North Western Railway for main line service and many of them were transferred into the LMS after the 1923 Grouping. Glue, paint and transfers are required to complete this model.
LMS 50ft Arc Roof Corridor Coach Kit
A total of 650 coaches of this type were built at Wolverton between 1891 and 1903 by the London and North Western Railway for main line service and many of them were transferred into the LMS after the 1923 Grouping. Glue, paint and transfers are required to complete this model.
LMS 50ft Arc Roof Corridor Brake Composite Coach Kit
A total of 650 coaches of this type were built at Wolverton between 1891 and 1903 by the London and North Western Railway for main line service and many of them were transferred into the LMS after the 1923 Grouping. Glue, paint and transfers are required to complete this model.
LMS Clerestory Composite Coach Kit
Built between 1898 and 1902 by the Midland Railway, these elegant non-corridor coaches were built for use on express routes. Glue, paint and transfers are required to complete this model.
LMS Clerestory Coach Kit
Built between 1898 and 1902 by the Midland Railway, these elegant non-corridor coaches were built for use on express routes. Glue, paint and transfers are required to complete this model.
LMS Clerestory Brake Coach Kit
Built between 1898 and 1902 by the Midland Railway, these elegant non-corridor coaches were built for use on express routes. Glue, paint and transfers are required to complete this model.
GWR 4 Wheel Composite Coach Kit
These coaches were constructed between 1890 and 1902 for rural duties, but lasted up until the 1950's on workmen's trains and the like. Glue, paint and transfers are required to complete this model.
GWR 4 Wheel Coach Kit
These coaches were constructed between 1890 and 1902 for rural duties, but lasted up until the 1950's on workmen's trains and the like. Glue, paint and transfers are required to complete this model.
SR/BR 28ton Bogie 'B' Van Kit
These vans were first built in 1937 and continued in use until 1986 on newspaper and mail trains. Transfers are included; glue and paints are required to complete this model.
SR/BR 12ton Box Van with Plywood Sides Kit
First built in 1945, 2,500 of these vans were constructed of plywood owing to the post war shortage of other materials. Transfers and brass buffers included; glue and paint are required to complete this model.
SR 12ton Uneven Planked Ventilated Box Van Kit
Built 1941 to 1944 by the Southern Railway, they also made 500 to the same design for the LMS and 650 for the GWR. Transfers are included; glue and paints are required to complete this model.