SORT BY
PAGE
  • 2

17 Products Found

GWR 4 Wheel Composite Coach Kit

These coaches were constructed between 1890 and 1902 for rural duties, but lasted up until the 1950's on workmen's trains and the like. Glue, paint and transfers are required to complete this model.

GWR 4 Wheel Coach Kit

These coaches were constructed between 1890 and 1902 for rural duties, but lasted up until the 1950's on workmen's trains and the like. Glue, paint and transfers are required to complete this model.

GWR 4 Wheel Coach Kit

These coaches were constructed between 1890 and 1902 for rural duties, but lasted up until the 1950's on workmen's trains and the like. Glue, paint and transfers are required to complete this model.

Corridor Connections

Pack contains 1 pair, essential detail for all model corridor train stock.

Coach Seats

Supplied with pre-coloured parts although painting can add realism; glue is required to complete this model. This pack contains enough seating for an 8 compartment coach - 520mm.

PAGE
  • 2

Trade Login

WOULD YOU LIKE TO BECOME A TRADE PARTNER?

PECO - PLEASE SUPPLY TEXT.
An introductory paragraph with criteria listed as bullets points, closing with contact call to action.