BROWSE PECO PRODUCTS
Browse through our complete product portfolio.
1167 Products Found
Platform Edging - Stone
Fully detailed, injection moulded plastic sections of platform edging; these units can be curved if desired. Use with Ratio 308 Flag Stones or other surface material cut to the desired platform shape. (There are 5 lengths of edging per pack).
Platform Edging - Concrete
Fully detailed, injection moulded plastic sections of platform edging; these units can be curved if desired. Use with Ratio 308 Flag Stones or other surface material cut to the desired platform shape. (There are 5 lengths of edging per pack).
Station Platform Shelter with Timber and Brick Huts
This plastic kit contains a platform shelter plus a timber and brick hut.
Platform Edging - Brick
Fully detailed, injection moulded plastic sections of platform edging; these units can be curved if desired. Use with Ratio 308 Flag Stones or other surface material cut to the desired platform shape. (There are 5 lengths of edging per pack).
Station Building, Brick Type
The pre coloured parts of this plastic kit can be assembled in a number of ways ; further kits can be combined to make a larger structure if required.
Station House, Brick Type
This kit will make 2 Station houses with single storey extensions; assembly can be varied , extra doors and windows are included.
Field Gates, Stiles and Wicket Gate
A useful addition to the LK-85 Flexible Field Fencing.
Flexible Field Fencing
This fencing will follow ground contours with the posts remaining vertical. The LK-86 Stiles and Gates pack provides access places.
Office Buildings
A pre coloured plastic kit that can be put together in a number of different configurations.
Signal Box
This pre coloured plastic kit is modelled on the iconic BR design built at Potters Bar in the 1950's. Full instructions included.
Goods Depot
A pre coloured plastic kit including a selection of accessories and full instructions.
Train Shed/Locomotive Depot/Engine Shed
Kit consists of parts to build one complete Train Shed Unit which will span two tracks, and can be combined with further units to build a larger facility if required. Inspection pits were often placed in the tracks in these buildings (See LK-56/156). Easily adapted to create a modern building for non railway use.