SORT BY
PAGE

157 Products Found

BR 13ton Open Goods Wagon

Over 8000 of these wagons (diagram 1/039, 1/044) were built to an LMS design in the 1950s. Used until the 1980s, some lasted another decade in the Civil Engineer’s fleet. These finely moulded plastic wagon kits come complete with pin point axle wheels and bearings. Glue and paint will be required, along with appropriate transfers. Additional parts to enable the vehicle to be modelled incorporating modifications made to the prototypes during their working life are included where appropriate.

BR 13ton Steel Open Goods Wagon

6500 of these wagons (diagram 1/037, 1/041) were built in the early 1950s, using a post war LNER design. Many survived into the 1980s. These finely moulded plastic wagon kits come complete with pin point axle wheels and bearings. Glue and paint will be required, along with appropriate transfers. Additional parts to enable the vehicle to be modelled incorporating modifications made to the prototypes during their working life are included where appropriate.

Diamond Frame Wagon Bogies

Kit and scratch builders accessory, as supplied with Bogie Sulphate Wagon kit PC20. Wheels not included.

BR 10 foot Wagon Chassis kit, Vacuum fitted Morton Brake

Kit and scratch builders accessory, as supplied with 13 ton Wooden Open Goods Wagon kit PC02A.

BR 10 foot Chassis kit, LNER Pattern Clasp Brake Shoes

Kit and scratch builders accessory, as supplied with 13 ton Steel Open Goods Wagon kit PC01A.

Coupling Mounting Blocks for Bachmann (TM) Couplings

Pack of 10 for 36-027 Mk2 Couplings, NEM shaft (cranked) with pocket.

VEA Chassis Air braked detail.

Air brake, no headstocks as supplied with VEA ex Vanwide kit PC76.

Coupling Mounting Blocks

15 pairs for Bachmann (TM) 36-025 and 36-026 Mk2 Mini type Couplings.

Coal Loads for Bachmann (TM) 16ton Mineral Wagon

Pack of 3.

Coal Loads for Bachmann (TM) MEA Mineral Wagon

Pack of 3.

Coal Loads for Hornby (TM) 20/21ton Wagons

Pack of 3.

Fine Chain 9 links per inch

Useful as a load or for securing loads, or for cranes, hoists etc.

Fine Chain 13 links per inch

Useful as a load or for securing loads, or for cranes, hoists etc.

BR BD Container

Diagram 3/050; a Conflat wagon or road vehicle load. As supplied with Conflat A Container Wagon kit PC52.

Ore Wagon Loads for Bachmann, Dapol or Replica (TM) 24ton Hopper Wagons.

Pack of 3.

Lime Wagon Loads for Bachmann, Dapol or Replica (TM) 24ton Hopper Wagons.

Pack of 3.

Coal Wagon Loads for Bachmann, Dapol or Replica (TM) 24ton Hopper Wagons.

Pack of 3.

MGR Hopper Wagon Top

Pack of 5 suitable for Hornby (TM) Hopper Wagons

BR FM Container

Diagram 3/201; a Conflat wagon or road vehicle load. As supplied with Conflat A Container Wagon kit PC46.

Coal Loads for HBA/HEA Hopper Wagon

Pack of 10.

BR 10 foot Chassis kit, Vacuum Fitted with Clasp Brake Shoes

Kit and scratch builders accessory; as included in the 12 ton 'Vanwide' kit PC41. Includes both LMS (J' Hanger) and BR Type Spring Suspension detail.

Coal Loads for Hornby (TM) MGR Hopper Wagons

Pack of 10.

LNER DX Open Container kit

As supplied with the Conflat 'S' Container wagon kit PC35; open containers were widely used until the early 1960's.

BR 12 foot Wagon Chassis kit (Unfitted) - Morton Brake

Kit and scratch builders accessory; as included in the 21 ton Loco Coal Wagon kit PC31.

BR 10 foot Chassis kit, Vacuum Fitted with Push Brake Shoes

Kit and scratch builders accessory; as included in the Shock Absorbing Open wagon kit PC28.

BR/RCH 9 foot Wagon Chassis kit (Unfitted) - Double Brake

Kit and scratch builders accessory; as included in the 16 ton Mineral Wagon kit PC22.

BR/RCH 9 foot Wagon Chassis kit (Unfitted) - Morton Brake

Kit and scratch builders accessory; as included in the 16 ton Mineral Wagon kit PC21.

LNER 10 foot Chassis kit, Vacuum Fitted with Clasp Brake Shoes

Kit and scratch builders accessory; as included in the 12 ton 5 Plank Open wagon kit PC25.

Bolster Set

Kit and scratch builders accessory; as included in the 21 ton Twin Bolster wagon kit PC18.

Trestle Set

Kit and scratch builders accessory; as included in the LNER/BR Trestle wagon kit PC17.

Wagon Loads, Ore

Pack of 3 for Lima/Dapol (TM) wagons.

Wagon Loads, Lime

Pack of 3 for Lima/Dapol (TM) wagons.

Wagon Loads, Coal

Pack of 3 for Lima/Dapol (TM) wagons.

LMS 50ft Arc Roof Corridor Brake Coach Kit

A total of 650 coaches of this type were built at Wolverton between 1891 and 1903 by the London and North Western Railway for main line service and many of them were transferred into the LMS after the 1923 Grouping. Glue, paint and transfers are required to complete this model.

LMS 50ft Arc Roof Corridor Brake Composite Coach Kit

A total of 650 coaches of this type were built at Wolverton between 1891 and 1903 by the London and North Western Railway for main line service and many of them were transferred into the LMS after the 1923 Grouping. Glue, paint and transfers are required to complete this model.

LMS 50ft Arc Roof Corridor Composite Coach Kit

A total of 650 coaches of this type were built at Wolverton between 1891 and 1903 by the London and North Western Railway for main line service and many of them were transferred into the LMS after the 1923 Grouping. Glue, paint and transfers are required to complete this model.

LMS 50ft Arc Roof Corridor Coach Kit

A total of 650 coaches of this type were built at Wolverton between 1891 and 1903 by the London and North Western Railway for main line service and many of them were transferred into the LMS after the 1923 Grouping. Glue, paint and transfers are required to complete this model.

LMS Clerestory Brake Coach Kit

Built between 1898 and 1902 by the Midland Railway, these elegant non-corridor coaches were built for use on express routes. Glue, paint and transfers are required to complete this model.

LMS Clerestory Composite Coach Kit

Built between 1898 and 1902 by the Midland Railway, these elegant non-corridor coaches were built for use on express routes. Glue, paint and transfers are required to complete this model.

LMS Clerestory Coach Kit

Built between 1898 and 1902 by the Midland Railway, these elegant non-corridor coaches were built for use on express routes. Glue, paint and transfers are required to complete this model.

GWR 4 Wheel Composite Coach Kit

These coaches were constructed between 1890 and 1902 for rural duties, but lasted up until the 1950's on workmen's trains and the like. Glue, paint and transfers are required to complete this model.

GWR 4 Wheel Coach Kit

These coaches were constructed between 1890 and 1902 for rural duties, but lasted up until the 1950's on workmen's trains and the like. Glue, paint and transfers are required to complete this model.

SR 12ton Even Planked Ventilated Box Van Kit

1,000 of this design were built by the Southern Railway from 1936 to 1939. Extra vents and transfers are included for the Dover ferry van version. Glue and paints are required to complete this model.

SR/BR 12ton Box Van with Plywood Sides Kit

First built in 1945, 2,500 of these vans were constructed of plywood owing to the post war shortage of other materials. Transfers and brass buffers included; glue and paint are required to complete this model.

SR/BR 28ton Bogie 'B' Van Kit

These vans were first built in 1937 and continued in use until 1986 on newspaper and mail trains. Transfers are included; glue and paints are required to complete this model.

SR 12ton Uneven Planked Ventilated Box Van Kit

Built 1941 to 1944 by the Southern Railway, they also made 500 to the same design for the LMS and 650 for the GWR. Transfers are included; glue and paints are required to complete this model.

LMS Traffic Coal and 4 Plank Wagons Kit

Set of 2 wagons. Originally LNWR wagons, they were in common use for carrying coal and general merchandise. The kit includes metal wheels, transfers and brass buffers heads, and requires glue and paint to complete.

Permanent Way Wagons Kit

Set of 4 wagons, 2 flat wagons for carrying rail sections, and 2 low sided open wagons for ballast and track maintenance equipment. The kit includes metal wheels,transfers, brass buffer heads and the rail load as shown, and requires glue and paint to complete.

PAGE

Trade Login

WOULD YOU LIKE TO BECOME A TRADE PARTNER?

PECO - PLEASE SUPPLY TEXT.
An introductory paragraph with criteria listed as bullets points, closing with contact call to action.