BROWSE PECO PRODUCTS
Browse through our complete product portfolio.
1529 Products Found
CDA - EWS China Clay Hopper Wagon, Maroon
In August 2023 DB Cargo retired the last of the former BR/ECC china clay CDA hoppers after a service life of 35 years. These unique and distinctive wagons will be missed by enthusiasts but thanks to PECO, modellers can keep their legacy going in model form!
Note that the CDA wagons are now fitted with metal-tyred wheels as standard.
The CDA China Clay hopper, and the HAA Coal Hopper, are closely related, sharing the same design and operational principles, with bottom hopper doors opened to empty the contents, in the case of china clay, for loading into ships at Carne Point, near Fowey in Cornwall. As china clay must be kept dry special rolling tarpaulin covers protected the load, as featured on our models.
MGR Coal Hopper Wagon (weathered)
Block trains carrying specialised loads are a feature of the modern railway. All Peco wagons feature free running wheels in pin point axles. The ELC coupling, whilst compatible with the standard N gauge couplings, keeps a realistic distance between vehicles and enables the PL-25 electro magnetic decoupler to be used for remote uncoupling.
Level Crossing Barriers
Modern type crossing barriers complete with dummy light standards. Can be used with the Peco N Setrack Level Crossings ST-20/21.
Loading Gauge
An essential piece of equipment that was placed near the exit from every goods yard, along with a catch turnout, signal etc.
Yard Crane
Kit of a useful general purpose type crane, also often seen at canal basins etc.
Water Tower
Often seen in the loco yard or near the platform end. Use LK-2 Water Cranes if additional cranes are required.
Tank Wagon
These wagon and van kits are very quick and easy to assemble. Consisting of a one-piece pre coloured body moulding, chassis, chassis weight, disc wheels and couplings, they are essentially unpainted, unassembled versions of our famous ready to run range.
7 Plank Open Wagon
These wagon and van kits are very quick and easy to assemble. Consisting of a one-piece pre coloured body moulding, chassis, chassis weight, disc wheels and couplings, they are essentially unpainted, unassembled versions of our famous ready to run range.
Concrete Sleepers
60 concrete effect sleepers for track construction using Code 143 Flat Bottom rail.
Turnout Blades/Brackets
1 set of Turnout Blades and Brackets for the construction of turnouts, using Code 143 Flat Bottom rail.
GWR 4 Wheel Coach Kit
These coaches were constructed between 1890 and 1902 for rural duties, but lasted up until the 1950's on workmen's trains and the like. Glue, paint and transfers are required to complete this model.
Signal Box Interior
Adds the finishing touches to any signal box (See Ratio 500, 503, 536, 552 and Wills SS48 kits); it contains all you need to fit out a typical signal box including a 20-lever frame and a level crossing operating wheel. Glue and paints required to complete model.
Large Water Tower
This 20,000 gallon design is equally at home replenishing water troughs, a large motive power depot or supplying several platform mounted water cranes (See Ratio Water Crane and Fire Devil kit 413 and Peco LK-2 Water Cranes). Supplied with pre-coloured parts although painting and/or weathering can add realism (See the Pecoscene Weathering Powder range PS-360 - 365); glue is required to complete this model. Footprint 122mm x 49mm
Water Trough
A essential feature on steam era main lines for over 100 years; this kit contains parts to make 760mm of troughs and includes relevant signboards. Use in conjunction with the large Water Tower (Ref 551). Glue and paints are required to complete this model.
Modular Covered Footbridge
With its fine scale latticework and curved section roof, this typical footbridge will add interest and a sense of importance to any model station.The versatile kit design means that the stairs can be assembled to face in either direction or straight off the end of the bridge. Additional kits can be used to create multiple spans, whilst larger, busier stations often had 2 stairways to each platform, leading off in both directions. Could also be used without the roof sections at a large terminus under an overall station canopy. Supplied with pre-coloured parts although painting and/or weathering (See the Pecoscene Weathering Powder range PS-360 - 365) can add realism; glue is required to complete this model. Span: 180mm
